Skip to content
The world's first systemised Job Change Tool

The Job Change Tool.

SKU Library. Live Execution. KPI Tracking.

Job change is the single biggest source of controllable hot-end downtime and rejects. Traditional changeovers rely on paper checklists, tribal knowledge, and shift-by-shift variation. We replace all of that with one system, built by operators who have changed every type of mould on every IS machine.

Used by container glass plants worldwide. Vendor-neutral. NDA-ready.
Comparison

Traditional vs Lean Glass.

The dimensions that move pack rate and EBITDA — side by side.

Dimension
Traditional
Lean Glass
Knowledge medium
Paper checklist + tribal knowledge
Digital, versioned, auditable
SKU configuration
Re-discovered each run
SKU Library — locked-in best-known state
Execution
Variable across crews & shifts
Live Execution — guided, timed, checked
Visibility
We'll see at end of shift
KPI Tracking — live target vs actual
Improvement loop
Tribal, slow, rare
Closed-loop: every changeover updates the Library
01
Pillar

SKU Library

Lock in the best-known state. Once.

Per-SKU specs — gob weight, mould cooling, swab programme, plunger setup, takeout timing, hot-end coating dose, lehr profile, target changeover time — versioned, auditable, change-controlled.

VersionedAuditableChange-controlled
SKU Library — Line 2
BEER-330-RGBv3.2 · locked
WINE-750-FLTv2.1 · locked
SPRT-700-PRMv1.4 · locked
FOOD-440-JARv2.0 · locked
Best-known state · BEER-330-RGB
Gob weight340g ±2Gob temperature1098 ±3°CMould coolingVertiflow 92%Swab cycle15 minPlunger setupProfile P3Target changeover06:30
02
Pillar

Live Execution

Every role sees the next step. At the right time.

Mould changer, IS operator, forehearth, QA — each role sees their next step on a tablet, with target timing, dependencies and quality checks. No shouting across the forming floor.

Role-awareTablet-nativeOffline-capable
Live changeover · Line 2
02:18 / 06:30
Forehearth pre-tune
Forehearth
00:42
Mould set staged
Mould room
00:55
Blank swap
Mould changer
02:18
4
Cooling setup
IS operator
5
First gob review
QA
6
Stabilisation
Hot-end superintendent
03
Pillar

KPI Tracking

Live target vs actual. Closed-loop.

Changeover time, first-ware quality, percent-pack, OEE recovery — tracked live, target vs actual. Every changeover writes to the SKU Library: confirming the standard, or proposing an update via change control.

Live target/actualClosed-loopMES/SCADA-integrated
KPI Tracking · Live
Changeover timetarget 06:30
06:42ON TARGET
First-hour yieldtarget 90%
93%ON TARGET
Percent-pack (4h avg)target 88%
86%TRACKING
OEE recoverytarget +5pts
+4.2ptsBEHIND
How it works in your plant

From SKU import to closed-loop in 8 weeks.

01

Configure

We import your current standards into the SKU Library in 2–3 weeks.

02

Pilot

Run on one line for 10–20 changeovers with daily coaching and tuning.

03

Roll out

Line-by-line rollout with crew training and escalation rules.

04

Improve

Monthly analytics reviews feed Library evolution. The tool gets smarter with every job.

30–55%
Avg changeover time saved
+12–25pts
First-hour yield uplift
>93%
Standard adherence
+4–8pts
Pack-rate uplift
What we don't do
  • • Sell IS machines, sensors or inspection equipment
  • • Take commissions from any equipment vendor
  • • Tie the Tool to a specific OEM
  • • Replace your MES/SCADA — we integrate with what you have
FAQ

Frequently asked questions.

Yes. Tablets work offline and sync when connectivity returns. Forming-floor wifi is treated as aspirational.

Both. You can buy the tool standalone once your standards are in good shape, or bundle with the Job Change Lifecycle service.

Vertech SIL, Wonderware, Ignition, Bucher Emhart equipment data, Heye HiPERFORM, Tiama HOT systems, Iris Evolution NEO, custom SCADA, OPC-UA.

See it on your data.

30-minute demo with anonymised data, then your questions. Vendor-neutral. NDA-ready.