Skip to content
Insights

Ideas from the floor, written for the floor.

Practical notes on hot end operations, digitalization, changeovers, and what we see working (and not) across container glass plants worldwide.

Factory filled with industrial production machines and equipment

Operational excellence that survives a bad shift

Most OpEx programs die the first time production is behind and tempers are short. Here's how to design one that doesn't.

23 April 2026 8m
Modern manufacturing plant machine with automated forming

OEE in a glass plant: what to actually measure — and what not to

OEE is abused almost as often as it is useful. Here's how we decompose it for container glass, and the three traps we see most often in practice.

23 April 2026 7m
Molten glass being formed by a craftsman at a furnace

Forehearth optimization: a practical guide for plant managers

Forehearth is the dullest system on the hot end and the one that most decides your defect rate. Here's what we look at, in what order, and what good looks like.

23 April 2026 7m
Molten glass being formed by a craftsman at a furnace

First-hour yield: the KPI most glass plants do not measure

First-hour yield is the difference between a changeover you can be proud of and one that looks good on a report. Here's how to measure and improve it.

23 April 2026 6m
Modern manufacturing plant machine with automated forming

Retiring the last spreadsheet: a pragmatic path to glass plant digitalization

Most digital transformations fail at the spreadsheet handover. Here is what works — role-based dashboards, existing data, no rip-and-replace, measured in months not years.

23 April 2026 7m
Glass bottles on a production line machine

Sub-six-hour job change in container glass: what it actually takes

SMED adapted for container glass — how to get from 14–18 hour changeovers to a choreographed six-hour dance without sacrificing first-hour yield.

23 April 2026 8m
Molten glass being formed by a craftsman at a furnace

A practical hot end optimization checklist for container glass plants

The diagnostic we actually run when we walk onto a forming floor — forming, forehearth, line coordination, and the data questions that expose root causes.

23 April 2026 9m

30-minute call with a senior practitioner.

Bring a problem — leave with a direction.