Job change
SKU Library
The locked-in best-known-state spec set per SKU — gob weight, mould cooling, swab programme, plunger setup, takeout timing, hot-end coating dose, lehr profile, target changeover time. Core component of the Job Change Tool.
How Lean Glass works with this
In an audit or engagement.
This term appears across our hot-end audits, forming audits and Job Change Tool work. If you would like to discuss how it shows up in your plant, book a call — every engagement begins with an operational diagnostic, not a sales pitch.
30-minute call with a senior practitioner.
Bring a problem — leave with a direction.